Need assistance or have questions? 1-866-815-7606

Avanos 2 ft Touch Proof Electrode Long Lead Set

https://www.duraprohealth.com/web/image/product.template/349564/image_1920?unique=8504316

$ 174.60 174.6 USD $ 194.00

$ 194.00

Not Available For Sale

Please call us for Availability

This combination does not exist.

Product Information:

  • Products Model: EL-2MTP
  • Product Brand: Avanos Medical, Inc.
  • Condition: New
  • Warranty: Satisfaction Guaranteed

Product images shown are for illustration purposes only and may not be an exact representation of the product. If you have questions regarding product images click here. The shipping cost provided is an estimate. Actual shipping and handling costs may vary based on the destination, logistics, supply chain challenges, and other shipment requirements. The actual shipping cost will be added to the final invoice.

Lead Set, 2ft, Long Lead Sets, Two (2) Sizes

Always First.

Be the first to find out all the latest promotions, news, products, and trends.